Project Location: Winchester, MD
Date Completed: March 2008
Owner: The Cowperwood Company
Architect: Kaplan McLaughlin Diaz
Square Feet: 165,000
LEED: Certified
This project is a four-level, 130,000 square foot office building, including the full interior build-out, a 35,000 square foot attached warehouse and 19-acres of site improvements.
The office building consists of a structural steel frame with a glass/precast façade. The warehouse construction included tiltwall concrete panels veneered with natural stone.
This project also includes a green roofing system, storm water run-off systems, permeable parking surfaces, water efficient landscaping, 75% waste management recycle/disposal, regional materials, air quality management, low VOCs, and sophisticated HVAC controls.
The building meets DOD ATFP blast and progressive collapse requirements.